9 am to 6 pm
Monday to Saturday
+90 532 274 9029
investexolutions@gmail.com
Oba Mahallesi Cevre Yolu Cad.
Gemicioğlu iş Merkezi 13 Kat:1 Daire:1 Alanya
This new complex will be built on the old Gazipaşa street road in Kargıcak Neighborhood and is 100 meters from the sea and only 25 km from Gazipaşa airport. I present to you the technical and social features of Light City below.
GENERAL USAGE AREA: 3000 M2
NUMBER OF INDEPENDENT SECTIONS PUT UP FOR SALE: 53 RESIDENTIAL UNITS
4 STORES
GENERAL INFORMATION OF INDEPENDENT SECTIONS
✔ Block A 1+1 Apartments ( 2 .3. 4. (15 Pcs on Floor) 50 – 52m2 1 Living Room, 1 Bedroom, 1 Bathroom, Toilet, 1 Balcony
✔ Block A 2+1 Apartments (2. 3. 4. Pieces on the Floor) 85 m2 Entrance, 1 Living Room, 2 Bedrooms, 2 Bathrooms, Toilet, 1 Balcony
✔ Block A 2+1 Duplex Apartments (5 Pieces on the 5th Floor) 105 m2 Entrance, 1 Living Room, 2 Bedrooms, 3 Bathrooms, Toilet, 2 Balconies
✔ Block A 4+1 Duplex Apartments ( 5th Floor 2 Pcs ) 175 m2 Entrance, 1 Living Room, 4 Bedrooms, 3 Bathroom Toilet, 5 Balconies
✔ Block B 1+1 Apartments (1. 2. 3. 4. Floor 20) 50 – 52 m2 Entrance, 1 Living Room, 1 Bedroom, 1 Bathroom Toilet, 1 Balcony
✔ Block B 2+1 Duplex Apartments (3th Floor 5) 100 m2 Entrance, 1 Living Room, 1 Bedroom, 3 Bathroom, Toilet, 2 Balconies.
✔ Block B 3+1 Duplex Apartments (2th Floor 5) 130 m2 Entrance, 1 Living Room, 3 Bedroom, 3 Bathroom, Toilet, 4 Balconies.
Technical Facilities
❖ Camera Security System
❖ Doorman
❖ Elevator
❖ Generator
❖ Social area Landscape and Water walls
❖ Air Conditioning system
❖ 3 Phase Electric Water heating system infrastructure
❖ Electrical cable infrastructure suitable for Smart Home equipment
❖ Telephone and Internet Line Infrastructure
❖ Video Diafon system
❖ Kitchen Cabinets, Batteries and Shower Cabinet systems
Recreational Facilities
❖ Outdoor Pool
❖ Indoor Pool
❖ Fitness and Step-Aerobic Gym
❖ Sauna
❖ Turkish Bath (Special)
❖ SPA center (Special)
❖ BBQ and Recreation Area
❖ Children’s Playground
Payment Options
30% in advance and the rest up to 12 months Payment plan is made.
Construction Schedule:
Our project will start on 01.10.2021 and become usable on 31 May 2023.
Compare listings
Compare